Custom Cast Iron\Brass Sand Casting iron casting Products
Material | Aluminum,cast iron,brass, etc | Prompt quote & Lead time guarante | 30 -40 days |
Surface treatment | Machining, Sand blasting, shot blasting, plating, power coating, etc | Material Standard | ASTM, AISI, ASME, SAE, NF EN, DIN EN, ISO, BS EN, SS |
Annual Output | 8000-10000 Ton | Inspection Equipment | Spectrograph, Tensile Strength Test Machine |
Certification system | ISO 9001 Registed; Strict material inspection; Exact dimension control; 100% quality control | Dimension Inspection | Calipers, Height Gauge, Micrometer Calipers |
1) Experience in casting for many years and served customers all around the world.
2) More than 500 professional and hard working employees pursue a wonderful career.
3) International advanced-level equipment such as CNC, numerical lathes, welding equipment, CMM and detect &testing equipment we used to ensure our product's quality.
4) OEM service, you demand is our pursued.
5) ISO quality control,IATF 16949:2016 certified
FAQ
1.How can I get the quotation?
Please give us your drawing,quantity,weight and material of the product.
2.If you don't have the drawing,can you make drawing for me?
Yes,we are able to make the drawing of your sample duplicate the sample.
3.When can I get the sample and your main order time?
Sample time: 35-40 days after start to make mold.
Order time: 35-40 days, the accurate time depends on product.
4.What is your payment method?
Tooling:100% T/T advanced
Order time:50% deposit,50%to be paid before shipment.
5.Which kind of file format you can read?
PDF, IGS, DWG, STEP, MAX
6.What is your surface treatment?
Including: powder coating, sand blasting, painting, polishing, acid pickling, anodizing, enamel, zinc plating, hot-dip
galvanizing, electrophoresis, chrome plating.
7.What is your way of packing?
Normally we pack goods according to customers' requirements.
Please give us your drawing,quantity,weight and material of the product.
2.If you don't have the drawing,can you make drawing for me?
Yes,we are able to make the drawing of your sample duplicate the sample.
3.When can I get the sample and your main order time?
Sample time: 35-40 days after start to make mold.
Order time: 35-40 days, the accurate time depends on product.
4.What is your payment method?
Tooling:100% T/T advanced
Order time:50% deposit,50%to be paid before shipment.
5.Which kind of file format you can read?
PDF, IGS, DWG, STEP, MAX
6.What is your surface treatment?
Including: powder coating, sand blasting, painting, polishing, acid pickling, anodizing, enamel, zinc plating, hot-dip
galvanizing, electrophoresis, chrome plating.
7.What is your way of packing?
Normally we pack goods according to customers' requirements.